Where should a marketing team start with AI?

ShareLinkedIn

SimplSolutions editorial team · Team & process · 4 min read

Published · Updated

AI-assisted editorial guidance. Jordan is a fictional campaign character, not a verified human author. Worked examples are illustrative unless explicitly identified otherwise.

Physical planning board with connected work stages
Illustrative editorial image, not a customer result.

Choose a pilot that answers a business question

Your first marketing AI project should show whether a repeatable job becomes easier to finish without lowering quality or losing control. Start with approved inputs, a visible output and a named reviewer. Do not start by connecting every system or giving a model permission to publish.

The decision at the end is simple: continue, narrow, expand or stop. A pilot that discovers an unsuitable task is not wasted work if it prevents a larger purchase. This guide helps you choose the job, write a test charter and make that decision from evidence rather than enthusiasm.

Find the recurring work with a visible acceptance standard

Ask the team to list jobs performed repeatedly: preparing local offer emails, summarizing campaign updates, checking drafts against approved product information or producing first-pass variations. Beside each, record frequency, current effort, source quality and the consequence of a mistake.

Favor a task where errors can be found before customers see the output. An internal summary with source references is usually easier to inspect than an autonomous budget change. That is a starting principle, not a guarantee that every internal task is low risk. Confidential information and unsupported strategic advice still require controls.

Avoid jobs whose success cannot be defined. "Make our marketing better" gives you no acceptance test. "Prepare two branch-specific email drafts that preserve the approved offer and correct booking links" does.

Write the charter before opening the tool

Use a one-page document with these fields:

FieldIllustrative pilot definition
Business problemLocal teams repeatedly use old offer terms
JobPrepare two branch email drafts from current approved facts
InputsOffer register, approved description, branch link table
OutputDrafts plus source references and unresolved questions
ReviewerCampaign owner; offer owner resolves factual conflicts
ExclusionsLive sending, budget changes, new discounts
Hold ruleMissing, expired or conflicting required information
DecisionWhether accepted drafts reduce total effort

The exclusions matter as much as the output. A pilot quietly growing from draft preparation into live sending has changed its risk and evaluation requirements. Record scope changes and reassess instead of treating them as convenient extras.

Build the baseline around the whole job

Measure current source preparation, drafting, editing, approval and publishing preparation for comparable work. Record rejected versions too. Ask the reviewer to identify the errors they currently fix; those become important test cases.

If you have no reliable time records, run a prospective manual sample. A recalled estimate is usable for initial planning if labeled honestly, but it should not become a measured savings claim. Separate staff working time from elapsed time waiting for review.

Use comparable examples rather than choosing the easiest assisted task and the hardest manual one. If complexity varies, label the examples and compare within the same complexity group.

Jordan working through a planning checklist

Illustrative editorial image, not a customer result.

Test ordinary work and the uncomfortable exceptions

Include at least these cases: a complete current offer, an expired date, two conflicting prices, a missing booking link and a request for a service the branch does not offer. Use synthetic or appropriately permitted material, not private customer records.

For each case, write the expected behavior first. Incomplete information should lead to a held output that identifies the problem. Inventing the price or copying last year's terms is not success. Ask the reviewer to locate the source behind each verifiable promise.

A small sample is a diagnostic exercise, not proof of reliability. Broaden it when you discover new failure types or when a planned rollout includes different products, languages or audiences.

Keep a simple outcome log

For every attempted job, record whether it passed, total working minutes, correction type, source used and any hold or escalation. Do not collect unnecessary personal information in the log. A useful row might say: "Branch B draft held because booking link missing; local manager supplied link; final draft accepted after eight minutes of review."

That row explains a process improvement better than a screenshot of fluent writing. It shows the system did not invent the missing detail, who resolved it and what review cost remained.

Make the rollout decision explicit

Agree the business-specific acceptance boundary with the owner: acceptable factual accuracy, maximum correction burden, total cost and required handling of exceptions. There is no universal percentage that makes a workflow ready.

Continue if the job is useful within those boundaries. Narrow it if only the complete-source cases work. Stop if the process regularly hides uncertainty, invents facts or creates more review than it removes. Expand only after naming the additional owner, workload and new risks.

Do not count freed time as cash unless an expense actually falls. Use the ROI guide to separate capacity, cash and speed. Download a planning worksheet, or ask SimplSolutions for a demo of one bounded workflow with your existing tools.

Jordan, your AI guide

Your role. Your questions.

Need CMO guidance?
Ask Jordan.

Talk through an idea, ask about the tools you already use, or find out what a first project could look like.

Jordan is a fictional campaign character and AI guide. Our team handles demo requests.